On June 10, 2022, the Bureau of Land Management (BLM” issued a new instruction memorandum (IM 2022-014), entitled National Policy for the Right-of-Way Authorizations Necessary for Site Characterization, Capture, Transportation, Injection, and Permanent Geologic Sequestration of Carbon Dioxide in Connection with Carbon Sequestration Project, directing the authorization of ROWs for the geologic sequestration and storage of CO2 on public lands, under Title V of the Federal Land Policy and Management Act of 1976. 43 U.S.C. §§ 1761–71; see also 43 C.F.R. Part 2800. The new policy makes clear that the Biden administration views the injection and storage of CO2 into federal pore space as one method for combatting the climate crisis, by reducing anthropogenic CO2 emissions into the atmosphere, and consequently, the impacts on climate from those emissions.
Pursuant to IM 2022-014, which became effective immediately, BLM may authorize ROWs for a minimum 30-year renewable term for site characterization, transportation, injection, capture, and the permanent storage of CO2 at classified injection well locations. Prior to authorization, however, BLM must satisfy several requirements.
BLM must complete exploration and characterization studies prior to authorization to ensure that no physical connections exist between different formations identified for CO2 sequestrations, and establish adequate monitoring programs to ensure long-term stewardship of project sites. Although BLM might be required to conduct environmental review under the National Environmental Policy Act (NEPA) for CO2 sequestration projects, the IM suggests steps BLM might take to facilitate expedited NEPA review.
BLM must also ensure that project applicants comply with all applicable laws, including obtaining necessary permits under the underground injection control program to comply with the Safe Drinking Water Act of 1974, and submit an approved plan of development with their application form. BLM will not consider applications complete until applicants execute a cost recovery agreement for cost reimbursement and pay all appropriate processing fees.
Other key provisions of IM 2022-014 are also worth mentioning. Notably, while all ROW grants for CO2 sequestration must comport with land and realty allocations within applicable resource management plans “RMP), IM 2022-014 provides that federal lands open for ROWs may not require an RMP amendment so any proposed use for CCUS must comport with the existing applicable RMP. IM 2022-014 also seeks to ensure that ROW grants do not interfere with operations authorized under the Mineral Leasing Act of 1920, to prevent damage to other potentially recoverable mineral resources and other surface and subsurface authorized uses.